5.5 TUYẾN CỐNG HỘP 2,5mx2,5m TỪ KÊNH 8 RA KÊNH 9 (dài 700m): Đề nghị đầu tư trong giai đoạn 1 để có đường thoát nước cho kênh 8 (1 phần kênh 8 bị san lấp trong giai đoạn 1).
SEWER 5.5 box 2, 5mx2, 5 m FROM CHANNEL 8 CHANNEL 9 (700 m long): the investment proposal in phase 1 to 8 channels for water discharge (1 part 8-channel during stage 1).
5.5 LINE FROM CHANNEL 8 conjugates 2,5mx2,5m RA CHANNEL 9 (700m): Proposed investment in Phase 1 to be drains to channel 8 (1 section 8 channels are being filled in Phase 1).