Slip is transferred from the tank at the pump slip through the house in the cast shop. The system is responsible for pumping the pump slip to two ranges Bank (L & R) and four Beam (Casting tank) under the pipeline system.
At the beginning of each bank, systematic process controls PLC to slip into a mold and discharge pump slip after filling. Slip is discharged in accordance with the different pipes in the tank containing the slip house to reuse