- Use a hydraulic jack and a PC audio capture bin lift system formwork and concrete slab.
- Dismantling of the temporary pillow underneath.
- Lower barrel gradually taking form system and reinforced concrete slab to the bearings.
- Links plates formwork frames taken with anti-tank.