While the Phu-Vung Tau will consider the following investment in appropriate time in the form of suitable with the condition of resources.According to the Ministry of transport, bien Hoa Expressway Project in Vung Tau designed to standard class A, highway design speed of 100-120 kilometers per hour, the scale 4-8 lanes. Full-length online about 77, 87km, including high speed standard 05km, 66, is the main street and the municipality. The point of connection with the road to avoid a route avoiding the city of bien Hoa, Vung Tau from the junction of 6, 5 km. The last point at km 68 + 670 the Phu bien Hoa-Highway 51. The total investment of the project about 24,478 billion.Ministry of transport said it is the large-scale project, the capacity of the current investor's development company, highway bien Hoa-Vung Tau (BVEC) is not guaranteed if done in the form of BOT (build-operation in South Korea
đang được dịch, vui lòng đợi..