Include measures covering works before dismantling (enclosed drawings TD.01 & TD.02) .Ben B conducted demolition roof section, the body to complete the 1st floor cos background of old works, Machinery foundation and demolition debris transport works out.
- Party B is allowed to use the entire material of demolition works are as follows:
+ System Roof tiles and iron and timber purlins kinds,
+ System traditional doors and old windows,
+ Steel in Concrete ,.
đang được dịch, vui lòng đợi..