ASKED ABOUT HANDING ITP For The WALL (CRW14-CRW21)send Mr/Mr Moat WholeToday is August 15, 09 (the date we require complete records for the CRW14 wall-ITP CRW21 in email)To date you have completed a number of items which we requested. But there are still a number of issues not yet complete-detailed as follows:I. Section of wall texture ITP1. Still some missing signature (have given Mr. Full go sign supplement)2 minutes of testing the machines before execution (for full).3. the report on the concrete form & compression test results compressing concrete form liners (For buttressing CRW 20.1).4. A number of request (gave a detailed list for the MR).5. Check list for ITP.II. COMPOSITION OF THE CLOSED PART OF THE ITP/PILE BTCT1. The minutes of testing the machines before execution (For both the piling & pile).2. Attach the delivery pile profile on ITP.3. Some pieces missing signature (SCC & NJPT).4. the test piles ITP are missing the whole (10 piles).III. PART OF THE ITP PILE CASTING (This problem was exchanged with Mr. Peace QC-stand alone are keeping the (whole) And Mr Peace will process when the required advice).* Note: profile of you do have a lot of missing and we need to fix the missing it in the shortest time (this is a very important issue for us for the payment)The proposal along with the US deployment as quickly as possible.I expect that we will complete this record before Monday next week (19-09-2016)
đang được dịch, vui lòng đợi..