Take advantage of the strip of land between the Southern Hau River and NMNĐ Long Phú 1 along the warehouse area construction from the contractor's execution warehouse PVC and PTSC-QN along with the strip of land in the Southern Hau River along the channel, She Sẩm to do the parking area. (See details in the drawing of the ground construction).
đang được dịch, vui lòng đợi..
