-In planning the space orientation to 2025 of BA RIA-Vung Tau, the planned high-speed routes of bien Hoa-Vung Tau walked way project connecting points and have 500 m down the coastal road is the main road in front of the project. The highway bien Hoa-Vung Tau investment expected building will connect the bien Hoa City-Long Thanh Airport – Long Thanh Expressway-oil Line-the coastal road (near the bridge Door Fill)-Highway 51B-Vung Tau city. With high speed on important project will connect the three most important economic centre of the country (the TP. Ho Chi Minh-Vung Tau city – bien Hoa City).
đang được dịch, vui lòng đợi..
