These materials are also stored in the warehouse, the QM has the task of managing the expiry date and the quality control of the raw material reaches 2/3 of the expiry date. When there is a lot of raw materials reached 2/3 of the term used, the QM will conduct planning and monitoring for batches of raw materials there. The above steps will be made as follows
đang được dịch, vui lòng đợi..
