Article 64. Firing load ensure system security1. electrical system operators and the mobile market is responsible for calculating, power distribution and power cuts in the power distribution unit and electric power use to receive directly from the transmission grid to make sure the electrical system is operated stable.2. The power distribution unit and electric power use to receive directly from the transmission grid has the responsibility to stop the power supply properly, reducing the level of capacity and power as required by electrical system operators and market power.3. in case of emergency, power system operators and market power has the right to dismiss a part load of the power distribution unit and electric power use to receive directly from the grid, including transmission when power and capacity cuts have been made in accordance with the request.