However, the payment of the purchase transaction may be delayed or deferred and at risk of being rejected if the documents do not conform with the requirements of the L / C. At this time, L / C may lose commercial value because the seller does not comply with the L / C or contracts.
đang được dịch, vui lòng đợi..