Examine the dress
Contractors perform sampling and testing as directed by the supervising consultant, the dress up for the cycle section was set up below and places specified by the investor to examine the relationship working between lagoon and water content or density achieved. Laboratory results must be submitted to the investor prior to construction. The examination of the samples and the samples approved not release the contractor from its responsibility for the technical quality of the building
does not have a portion covered by the investor for approval without a minimum 3 test results satisfactory.
storage and cleaning of schools
đang được dịch, vui lòng đợi..