Chiller plant's engine room, there are three existing chiller. outlined plan is separate chiller to replace 2 system out, take it out of the engine room, before putting into place new chiller
addition, the need to connect the remaining chiller immediately into the system to ensure the operation of the plant during installation of a new chiller.
It is notable, that this work should be completed within 24 hours, but also to ensure safety procedures are very strict labor of factory
đang được dịch, vui lòng đợi..