13.1 times the daily work in the building under this contract shall be determined as follows:
- Monday to Friday: from 7:30 den17h30
- Saturday: from 7h30 to 12h00
- Sunday and public holidays stipulated by the Water: Vacation
13.2 If Party B demand, mode overtime regulations must be notified in advance in writing to the Party A to have specific arrangements.
13.3 Any request overtime provisions will incurred costs, overtime costs of the building are calculated as follows: $ 10 / hour / companies (no VAT) (for the leased area 1 story). If hired many stories will multiply the results is the number of floors that companies hire.
đang được dịch, vui lòng đợi..
