Before breaking down the old pier, proceed up first temporary flood protection dike in sacks with bamboo poles protective earth (for details see drawing)
+ The old pier demolition will be carried out in stages (from 20-40m ), dismantle the old pier to
where the construction pile to pile, and execution proceed to where the old dike embankment return
to it, while turning in sacks shore dike soil may leave a little to reduce load
waterfront (Each piece 20m is made within 5 days)