8.6. Of electric energy (electric power tool Centre... etc.)1. All electrical circuits and circuit branches of service will be installed in compliance with applicable regulations on the market. Only the new electricians are allowed to conduct electrical work2. The contractor will have to install temporary grounding system for the entire electrical machinery and equipment. Grounding resistance is lower than 4 Ώ. Drawings for grounding systems, INC. will be submitted for approval before conducting ground connection.3. The contractor is not allowed to proceed to cut electricity for the power source on 600V unless anti-arc beam cutting equipment. Director of construction company, INC. or head of HSE, INC. company or commander of a construction contractor will have to be informed in all the situations the power cut. A special permission will be required for this work.4. Only the electrician has been assigned a new permitted dismantling the fuses. ARC rays-resistant equipment, special permission is required if the power source on 600V.5. use of 600V type cables have two layers of insulated wire with ground connection and no connections. The cables stretch across the work area must be suspended or shielding and arrange to remove the risk of tripping. Wire rack to firm, at the point of contact with the wire of the holder must be wrapped layers of insulation.6. The surface of the steel structures that use electricity will have to ground connection.7. connect the wires to length is type 3 wire with voltage as low as 15 Amperes. 8. All electrical plugs and Sockets must be IP industry type 45 or more.9. The wire must be connected the correct specification and certainly from the electric circuit.10. Turkish, hot and steel structures have to be temporarily grounding grounding systems in time of eternity yet
đang được dịch, vui lòng đợi..