At locations across the concrete pipe, before pouring concrete at least 12 hours, at gunpoint S2 SikaSwell pump, nozzle with a diameter of 10-15mm, pump 2 around the tube, the distance between the two rounds of 50 mm and note the concrete covered sections must be greater than 100mm.
đang được dịch, vui lòng đợi..