Fixed shelving of this section of pipeline terrestrial component can be made of concrete, go underground section Pier floor can be made of bracket is screwed to the nut bolts into concrete products such as SM1 Head.
this paragraph investors and unit design also noted the interference pattern up - Down the part goes to the floor and went out from under the Harbour Bridge.
đang được dịch, vui lòng đợi..