4.3.3. The installation steps of wardrobe• Step 1: check the size:-Check the size of the wall is opened in the correct size of the cabinets (according to the production drawing)-Check the horizontal and the vertical height and straightened the angle of the wall box.• Step 2: install the barrel of wardrobe-Installation of cabinets & barrel foot fixation increases in public works.-Put the barrel in position adjustment the kid by tang.• Step 3: installation of the wing, boxes & accessories-Position the installation position of the hinges, sliding Rails, strut bar hangers, mo ...-Installation of hinges, sliding rails are extremely careful and meticulous as this is the stage the decision very much to the quality of the cabinets as well, operating speed, aesthetics.• Step 4: installation of the splint just, shoot the silicone angled-Installation of the splint only cover the gap between the cabinets to the wall, the plaster ceiling, the lien by Ding fang-Silicone Shot small slits4.3.4. The cabinet installation step lavabo• Step 1: check the size:-Check the size of the wall is opened in the correct size of the cabinets (according to the production drawing)-Check the horizontal and the vertical height and straightened the angle of the wall box.• Step 2: installation of galvanized iron frame-Locate the location of the drill holes on the wall links.-Galvanized iron frame links to the wall with galvanized iron stats code 100mm_D8mm (on) with the distance between the 2 switches listed iron 300 mm-Galvanized iron frame links to the wall with plastic 50mm_D10mm inventory guidelines (below) • Step 3: installation of the barrel -Positioning and installation of hanging Bowl (bowl of Hafele hanging) -Put the crate into position, alignment, and linked with the hanging Bowl-Iron frame with barrel link with screw • Step 4: install the barrel under kitchen cabinets-Put the crate into position, alignment and link blocks (modun) barrels with screw• Step 5: installation of the rock face (by CDT construction contractors)-Installation of the rock face under kitchen design.-Cut a hole in the ice surface elevation for lavatories, faucet ...• Step 6: installation of the wing, boxes & accessories-Position the installation position of the hinges, sliding Rails.-Installation of hinges, sliding rails are extremely careful and meticulous as this is the stage the decision very much to the quality of the cabinets as well, operating speed, aesthetics.• Step 7: install only splints (if available), the silicone angled shot4.3.5. testing and delivery -Clean excess supplies, sanitation of premises prior to delivery-Quiet Mode, which smoothly when operating the try.-When the door open close snugly tightness (1 mm/1 m)-The location of the components according to drawing.-The quality of the operating accessories try4.4. Impact glazing kitchen cabinets• Step 1: check the size, using the.-Check the glass size matches the wall (according to the production drawing)-Check the flatness of the surface of the wall, the wall must be at least 1 layer of paint.-Note the category fitted rock face and kitchen cabinets are finished before glazing.• Step 2: installation of the glass with the wall with silicone-Note Select neutral silicone type suitable for pasting large glass gauge -Shoot the thick silicone line of 5-10 mm glass panels back hand border-Shoot the line silicone along the vertical face of the lung with glass glue lines distance 200 mm.-Use hand tools inhalations glasses to put the glass into position.-Pressed tightly into the glass wall to wall with link silicone-Take measures to hold the glass panels in the time dry silicone and reached the military from 8-12 h by tape glue, wooden splints.• Step 3: residual glue & toilet shot silicone around at the location of the adjacent cabinets.D. progressThrough the profile of design research works, combined with the ability and experience to execute similar projects in the past years, we build progress consistent with the scale of the Virgin1. Working timeWorking at the time: 8 hours/shift.Execution time: according to the construction schedule2. accelerate solutions:• Build the system structure from the company to Ban command to the construction workers and a coherent way, throughout. Assigned functions, powers, responsibilities, interests of each stitch perfectly enough force to control and handle production (progress-quality);• A comprehensive balance the face in the field of mass, time, people, materials, motorcycles, equipment for building production planning and contingency plans for all constituent elements in production;• About human resources: through progress, the volume of work performed based on norms, determining the number of workers to organize, layout reasonable production for each work, and there is plans to do more ca, increase manpower;• On time: ban command alignment schedule, proactively adjust flexible reasonable progress on the field and to report to the company to promptly adjust back plans to provide materials, equipment;• About supplies: brings out the progress of supplies including browser and work provided, ensure the supply of materials in the right quantity, quality and time requirements do not affect the progress of construction.E. remedies companyThe work of trials conducted in accordance with the provisions of the State: 1. Individual sectionsThe records should be:-The minutes of individual phases;-Minutes of the part
đang được dịch, vui lòng đợi..