-Before the baits, paint needs to complete the following task:-Construction is completed the waterproofing layer (if any).-Installation of pipe system engineering (plumbing, electrical lines, pipe, buried underground).-Do not make baits work, paint surface structure when the humidity exceeds the humidity allows. Humidity allows for wooden constructions with oil paint is 12%. Humidity allows for structural concrete, plaster, brick wall when using paint is 8%.The material must be packed, painted baits carefully left the manufacturer's marks, when the packaging damaged or lost production marks have the doubt of the quality needed to check the quality before using it for the work.-Construction mastic layer reaches the technical requirements, no dust, no cracked foot, smooth flat surface.-Check and repair the defect on the surface of the paint. Structure surface before painting should be clean of dust. The surface roughness, the defective seat need fillings matic for guest before sanding smooth.-The paint is scanned as many layers: lining, coating. New class after class of dry before scanning. To preserve the well when the paint dried yet.-Direction roller coating so that the final grade must follow the vertical line for the wall, the light from the door to the ceiling, wood grain lengthwise for wood surface.The baits, the paint must follow each class according to types and thicknesses according to the design, only made the next paint after the consent of the technical monitoring of works.-Paint surface baits mastic: flat, smooth, glossy, no pitting, no bong virus thickness not exceeding 3 mm, fi, layer surface mastic is evenly colored. Painted surfaces must be the same color, smooth, glossy and not priming route inside.
đang được dịch, vui lòng đợi..