IF IN CONTRACT CPG RESPONSIBLE DESIGN IS SUCH ITEMS MUST PROVIDE CPG DRAWING FOR OFFICIAL TPD, NOT DRAWING INFORMATION. PRESENT WE ARE REQUIRED TO MAKE TUBE DRAWING WAITING FOR WASTEWATER TREATMENT TANK PREPARATION concreting NEED NOT DRAWING FOR FINISHING WORK
đang được dịch, vui lòng đợi..
