The preparation work before its hot plasticDepending on the road surface needed hot asphalt road surface type is its rubble new or old, the street-level distribution of stones, gravel road surface or levels of stone reinforced cement, reinforced soil cement road surface or lime, new or old asphalt (asphalt concrete, plastic, plastic spatula crept ...) that the preparation of surface before its hot plastic is different.Before its plastic, textured road surface to ensure the requirements of intensity and geometry elements such as design rules. If the old line it must be repaired to restore the shape horizontal and flat level monitoring.Its the hot plastic on the side of the road types only works when the weather is sunny, the air temperature is greater than 15OC. If no guarantee this condition, should research using the method of its plastic by asphalt emulsion acid radicals.
đang được dịch, vui lòng đợi..