Time dismantling formwork proceeded after pouring the concrete company is 2 days with no power and after the formwork at least 21 days with formwork. The rule scrapped formwork: "following Mounting, remove the first. Before mounting, remove after. " Just remove the formwork once by design, after the structure has sufficient resources When dismantling formwork to avoid bumping into the other components at this time because the structure bearing capacity is still very poor. Formwork after removing the folding neatly into each to repair and for use in other areas. Remove the sequence backwards with the mounting sequence. Just remove the each Department formwork floor are poured concrete 1. Formwork of floor adjacent to the floor are poured concrete floor right to resources in the region are pouring concrete. When dismantling the poured floor in momentum coffa precast concrete blocks full of buiding should do the following: -Retain the whole momentum and pillars in the panels located adjacent to under panels are about to pour the concrete company. -Removed each section (removing the 50%) of the column against the bottom slab in coffa, and retain the pipe securely separated 3 m below the beams have the beat > 4 m. -The partial loading up the texture after scrapping coffa da should be calculated according to the concrete has gained strength, the type of structure and the load characteristics to avoid cracks and other structural damage. The essence of the entire load up the texture has scrapped most of the momentum, coffa made only when the concrete reaches the design intensity.
đang được dịch, vui lòng đợi..