I know at present, Ministry of transport are directed to build circular about the weight load of the goods prior to export, apply with the port or waterway port has gone international. With characteristic activity of the naval Logistics Center Into the discussion parties to conduct the weigh station 01-equipped container closed as necessary.
đang được dịch, vui lòng đợi..
