The steel tubes are available in a steel cage reach (3 tube with 1000 piles, 4 tube with 1200 spindles) are according to the perimeter of the pile form a triangular or quadrilateral. The tubes must be filled with water before conducting the test (as have conducted above) + Drop 2 receiver, into the different pipes (2 top must be at the same high level). + Measure time journey and manifest the range obtained. -Number of test piles: piles, then every 10 Select 1 pile experiments, pile experiments were selected randomly and uniformly with design consultants or 10 ÷ 25% of the total number of piles according to ISO 9396-2012 (when conducting experiments with other methods). -Conditions apply: + The tube must be very clean before use: detergent waste or sludge buildup in the pipes. + The minimum age of the pile when the probe is in good condition 2 days. + Don't cut pile before measuring. -Using this method can perform 5 ÷ 12 spindles/day but depends on: + The number of advance pipe in the pile. + Exposure conditions and the distance between the piles. -Pros and cons: + Advantages: -Locate anomalies in body depth of piles and piles of fuselage cross-section. -Describe the results directly. -Recorded on the entire length of piles.+ Cons: + Can not make the quality of pile tip contact, the probe stopped making the tip piles 10 (cm) in the case of good. + Need expected latest exploration holes, thus increasing the price stakes. The greatest distance between the + the tube in place is 1.5 (m) corresponding to the current device.* Small deformation method -Sets of equipment including:+ Hammer shock has a weight of around 2 kg+ Early acceleration measurement Head piles. + The Division record and analyze the results. -Conditions apply: + Contact hammer type pile head and must ensure good exposure. + Early to accelerometer piles must meet the technical standards of measure. -In technical terms well prepared, a day a person operating the machine operation can measure upto 350 piles. -Number of pile test not less than 50% of the total number of piles.+ Advantages: -The detection of defects in the scope allows fast, lower cost price Construction quality control of fast in any conditions. + Cons: -Only accurately reflect the integrity of piles in pile length range not exceeding 30 d (D-diameter pile). * Dynamic method: -Dynamic method used is: vibration method. + Content of the method: + Laboratory industry Piles are forced vibration with amplitude does not change while the frequency change. Then the speed of the shift of the pile is measured by the measuring head.As the pile's defects + variation in quality of concrete, weak reduction measurements are evaluated through resonance.+ Dynamic methods are generally quite complex, requiring expert should have a high professional level. Select static compression options to check the quality of the pile after the execution, test 1% the number of piles and no less than 3 piles.II. 8.3. Concrete work server: Transport concrete: KAMAZ 5511-logotype, has the following technical parameters:
đang được dịch, vui lòng đợi..