3.2.2 costs made investment and exploitation of project businessa. costs of project implementation phase• The total cost of the project in the project investment stage: 77,597,238,081 VND (is the total cost not including bank interest during construction). Include the following cost items:• Construction costs: 55,495,880,000 VND• The cost of equipment: 5,741,814,000 VND• The costs of consultancy, project management and other costs: 7,503,204,891 vnd• Costs of infrastructure construction: copper 1,993,249,300• The cost of redundancy: the bronze 6,873,089,000 b. the costs during the period of exploitation of business• The total cost in the stage of exploitation of business: 817,296 million• Depreciation: 70,724 million. Of which:• Construction costs are: 2,599 million (the total construction cost is 64,992 million depreciation within 25 years)• Cost of equipment is: 573 million (the total cost of the equipment is 5,732 million, depreciation in the past 10 years)• Operational costs: 718,389 million. Of which:• Personnel costs (direct + indirect): 614,824 million• Cost management: 103,565 million• The cost of the loan interest rate: 28.183 million. (long-term investment loans to repay within 10 years, the total loan and repayment period is 10 years, with the interest rate is 8% per year)
đang được dịch, vui lòng đợi..