QA / QC Programme: please add inspection test plan.
Please add in a section of repairing / damage.
Step 2: mark the bore hole on the pre-installed concrete blocks in the wall, followed drilling holes.
Step 2: the rail Phải embedded in concrete.
step 2: cover the wood layer phải perimeter door frame and wall gap giữa
note: reference standard, QD 212 / BXD, date 25.02.2013
work sequence: lacking of protection plan
artelia recommendation from
the contractor comply phải with any requirement in the MOS but not indicated in the specification