Installation of the chimney: for generators (825 kVA and 1,250 kVA) is located at basement 1 of the apartment block. Project layout of waste gas pipeline from backup generators along the way of ventilation pipes and beyond the rooftop apartment taken when emissions from escaping air environment. Total height of the chimney is 144, 5 m (144 m + 0, 5 m in which the height of the block is 144m and height exceed the roof chimney is 0.5 m).
đang được dịch, vui lòng đợi..