e. drill hole end conditionsEnd-depth boreholes were expected and stating the required votes in the survey. Based on the scale and regional geological exploration depth recommendations as follows:+ For land (land type): 7.5 metres deep drilling Has repeatedly with hammer 20/30 cm ≥ NSPT; The equivalent soil having a hard half status.+ For land (sand land): 7.5 metres deep with a 30/30 cm dam coward ≥ NSPT; The equivalent soil layer status.+ For the original 2.5 metres deep drilling: minimum continually in the stone block weathering and chapped medium; -In the process of drilling, if the boreholes already satisfy the conditions to end the drilling hole, but has not yet reached the depth boreholes as expected, then lets stop drilling. -Boreholes reached the depth expected which has yet to satisfy the conditions to end the drilling hole, then:+ If the drill holes geological survey did not change significantly, then allow the drilling of deep boreholes for 3rd in another satisfied the conditions to end the drilling hole. + If the drill holes geological survey complex changes, the deep drilling at all 3 pits until satisfied the conditions to end the drilling hole. -When drilling encountered complicated changes strata. Drilling Unit survey immediately notify owner and relevant parties to have resolved.f. the work of drillingThe work of drilling sampling is done to identify boundaries of strata, the status of the land. Application of the method of rotary drill pump wash with a solution of Bentonite clay. In the process of drilling holes ensure drill is vertical, not crash into wells. After the end of the drilling work conducted observation of water level in drilling holes in time 24 hours, each hour measured once. Following observation boreholes are filled up again to ensure a safe and sanitary environment.Drilling works will be documented fully in the cylinder bore holes. Cylindrical boreholes need to demonstrate the following:
đang được dịch, vui lòng đợi..
