Step 6: SHOOTING BARREL FORMWORK SYSTEM INSTALLATION-The Volume of supplies on barges to the construction location.-Using the crane, workers pick up and install the formwork panels the barrel shooting at the corners.-Installation of the frame located at an elevation of I300 + 7.55, the I300 from the basement up to erection.-Insert the barrel formwork system complete capture, anti-I300 frame system as designed.-Locking barrel formwork system legs taken into the plate BTCT.