b) erection of formwork:-Transport of not damaging the formwork.-Trees against the inventory.-Limit the connection parts mainly, layout connection. Connects the user to the plinth, bolts.-Erection ensures swappable, removable parts before disassembling parts after impact.-Adjust by rising orders, handles, screws, so enraged. Sturdy, does not deform when subjected to large forces.-Ensure the sealed formwork.c) dismantling formwork:-Wall formwork, column removed when the concrete reaches 70% intensity.-When scrapping: Avoid damaging the surface, chipped concrete.-Remove the planks stood before and from the top down.-Remove the wedge, so enraged against before removing the formwork.After scrapping to remodeling, storage compartment lid.