as far as our meeting this morning,We would like to send you the drawing, including:-construction drawing of the cliff (has more details about the thickness of the walls), few details of changes compared with the design.-floor drawing: we have additional requirements for placement of flooring types out on the-drawings are bare again editing (changes mainly in room 13)-the details of construction our concrete wall remains as originally designed.Please check the attached file.
đang được dịch, vui lòng đợi..
