Identify the station as heart 2. At the moment on the face BT lined layer had the sections intact piles (length 30 cm) and the steel 70 cm long beard after breaking BT terminals. Erection of steel directly right in the tríđài Foundation. Cover the main reinforcement design distance (above the top of the pile). Cover extra reinforcement design distance. Use wire tie into the grid then install rebar wait by the radio station. Reinforcement so enraged was the combination into the frame in the correct design put on the erection in the formwork. Use the Member stats by BTCT have mounted Shaver for forced steel ensure correct distance abv.