I) works of technical clues: Includes the works of technical focal areas (Metro line 1 stations are integrated with the BRT number 1), connect the system in and out of the area (water supply, sanitation, power supply, etc.), combined with the green zone or Park zone isolation.
đang được dịch, vui lòng đợi..
