-The contractor are responsible for establishing the complete drawing. In the completed drawings must indicate the name, the signature of the person who created the drawing of complete success. Legal representative of the contractor must be signed and stamped. The completed drawing is the basis to perform warranty and maintenance works.
đang được dịch, vui lòng đợi..
