Bre17 want to submit plans for the crane in service projects as follows: - At the bridge site CO03: Crane KH150 accreditation has expired and can not be the installation of alarm overload (overload warning system) should Bre17 This will replace cranes by crane LS118 (lying at bridge site CO01) and the alarm overload is expected to be installed on the day 05.22.2015. - At the bridge site CO01: Bre17 will mobilize 1 Other LS118 cranes on the construction site, we expected dated 05.27.2015 shall invite the acceptance crane after completing installation of alarm systems overload. Bre17 want to discuss the requirements of the appointment of DLM agreed to mobilize the devices were manufactured from 1996 up to present. The implementation of this requirement is very difficult, because these machines were manufactured between 1996 and returned here with very high rents, which will push up the cost of construction and installation, further in the contract between them It has no provisions on this matter. So Bre17 DLM has approved proposals for the use of machines from 1996 onwards, if not approved, it is recommended DLM held 1 formal meeting so that we can discuss this issue
đang được dịch, vui lòng đợi..
