Place the jacket cover: steel tubes with a diameter greater than the diameter of the pile 1.6 1.7 times higher
to 0.7 1m contains bentonite clay solution, which is plugged into the earth shirt 0.3 0.4m thanks to
the crane and vibrating equipment.
đang được dịch, vui lòng đợi..
