Based on the minutes handed the premises on 5/12/2014 of the owner, the contractor had mobilized construction machines and equipment vehicles to the field to progress as planned. However, in the course of construction, the contractor has discovered, on the premises had been handed the key waste water drain pipe, D350 villas of the red star line and the D110 roads at the heart line (LY the Km17 + 480), the key for waste water discharge, water supply and road manholes D110 right online (logical process from Km17 + 420 to 480 + 17 Kilometer) natural ground way about 30 cm