Before digging up soil organically, inappropriate materials and after glowing will execute temporary drainage ditches around the area to dig up the soil to prevent water flow into the training area during the digging up of weak soil layers and up charged to pitch the bottom of sand cushion layer according designed PROTECTION WORKS
đang được dịch, vui lòng đợi..
