Thanks for the feedback on my emailLike email sent on 17/10/2016, contractors please review carefully the tender attachments include: pdf drawings, the specifications had clearly shown. The contractor is not to change anything in the bid. Scope of work: all included items such as bid sent (except: transformer, capacitor Cabinet, backup generators, lighting in the home. Include the power cable from substation to the cabinets of ATS, ATS and cabinets to generators from from ATS cabinet about MCC and Cabinet-level source for lockers in the heating system (cabinet from MCC) this work has had other contractors perform.tender of the company we've clearly shown these things. the contractor consider carefully and respond as soon as possible.