3. cable distribution cabinets from the selection set in the substation to non-preferred Cabinet APPLIED PHYSICAL CHEMISTRY 1 and the cable up to the 2nd floor apartment (Figure 5.5):
3. Select the cable from the distribution panel located in the substation to prioritize cabinets and cable TD 1 level to the apartment floor (Figure 5.5):