• Borrow pits for embankment material will be investigated and prepare dịch - • Borrow pits for embankment material will be investigated and prepare Anh làm thế nào để nói

• Borrow pits for embankment materi

• Borrow pits for embankment material will be investigated and prepared all necessary documents to submit the Engineer for approval including taking soil sample at borrows pit and testing in laboratory and the like.
• The Contractor will mobilize Equipment and Materials to site.
• The compaction will be carried out using proposed equipment and method statement approved by the Engineer.
• Before starting embankment work on site, the Contractor will establish control point system to support for embankment works. Existing ground will be surveyed by The Contractor and confirmed by The Engineer in writing.
• Temporary access shall be made following the correct sequencing of work execution.
• The workers will be briefed about safety matters.
• Communication on Site will be conducted via mobile phones and walkie-talkies
0/5000
Từ: -
Sang: -
Kết quả (Anh) 1: [Sao chép]
Sao chép!
• Borrow pits for embankment material will be investigated and prepared all necessary documents to submit to the Engineer for approval including taking soil sample at borrows pit and testing in the laboratory and the like.• The Contractor will mobilize Equipment and Materials to the site.• The compaction will be carried out using the proposed equipment and method statement approved by the Engineer.• Before starting work on site, the embankment Contractor will establish control point system to support for embankment works. Existing ground will be surveyed by The Contractor and confirmed by The Engineer in writing.• Temporary access shall be made following the correct sequencing of work execution.• The workers will be briefed about safety matters.• Communication on Site will be conducted via mobile phones and walkie-talkies
đang được dịch, vui lòng đợi..
Kết quả (Anh) 2:[Sao chép]
Sao chép!
• Borrow pits for embankment material and the prepared sẽ investigated to submit all documents cần the Engineer for approval gồm soil sample taking and testing printed at borrows pit laboratory and the like.
• The Contractor will Mobilize Equipment and Materials to site.
• The compaction will Be Carried out using the proposed equipment and methods approved by the Engineer statement.
• Before starting work on site embankment, the Contractor will lập control point system to support for embankment works. Existing ground surveyed by The Contractor Will Be Confirmed by The Engineer printing and writing.
• Temporary access shall only be made ​​sau the correct sequencing of work execution.
• The workers will be briefed about safety matters.
• Communication on Site Will Be Conducted via mobile phones walkie-talkies and
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.