On the basis of the results of calculation of hydraulic project component 1, component 2 in drainage projects and became umbrella quyêt Tham Luong-Ben Cat-Slit Up with options selected as option 6. "Calculate the tidal compartment drain according to the master plan of the Ministry of agriculture and rural development has approved, the tribute is operated when the water level beyond the river is greater than 0.60 m closed, drain valve, operating Art Vam have Slashed Water drain Up one-way operation".
đang được dịch, vui lòng đợi..