In the process of the s10-2, after receiving drawings map the current state of water supply and drainage system of residential s10-2. Vicons conducted the survey the current state of the party line number 22, at 13 h 30 on 7/12/2015. After our survey discovered a domestic water supply pipe Ф200 level for water pipe and 1 green Ф100. 2 pipeline located in the area close the old basement construction measures Larsen, making it difficult for the construction process. Due to the S10-2 work progress so should fold Vicons look forward to receiving support from PMH for relocating 2 way he on