dc) discharge of water:The reservoirs after LPG to the required level and to stability will be conducting flushing freedom according to the products entered. During this time, hot will not be exported or imported. Before sampling, the water in the tank of LPG products must be discharged outside the flushing process, the PRD-bridge tank OPP-OFS-52706.
đang được dịch, vui lòng đợi..
