Article 6. Asked about the quality of products and delivery of the contract products,building construction 6.1. product quality requirements of the contract for the construction of:a) works must be constructed according to the design drawings (including the revised section are homeapproved investment), the technical guidelines are outlined in the bid suit with the system rulesstandard, the standard to be applied to the project and the regulations on the quality of construction worksof the State concerned;b) Side B must give A party the results of experiments of the input materials, productsof work completed. The results of this test must be performed by a laboratoryexperience the prescribed standard. In the event the meeting suspected A side experiment resultsthe right to request party B repeated to confronting.c) Side B ensure supplies and equipment provided by party B has the origin, quality certification, auditing certification such as the provisions of the contract records.
đang được dịch, vui lòng đợi..