5.5. water supply design, applied according to the current standard:Water supply-external network and the work-design standard TCXD 33:1985.Drainage-external network and the work-design standards-TCXD 51:1984.5.6. water drainage design, applied according to the current standard.5.7. The Administration of the hotel to ensure natural ventilation. Depending on the needs of the room should have a forced ventilation system, the steam system and air conditioners.5.8. The air conditioning equipment in hotel design according to the requirements of the technical-economic justification.
đang được dịch, vui lòng đợi..