4.2.1. Preparation workBefore installing wood floors need to check and make sure the following criteria:-Sanitary the premises were handed over in preparation for construction.-Check the high ground present before installing laminate flooring 12 mm thick, industrial grade thick-lined form 2-+ 3 mm. Note ensure the distance between the rim under the door and the ground floor is 8-10 mm according to design requirements.-Fully prepared industrial parquet and the tools, instruments required for the process of installing industrial parquet before proceeding. Ask shipping industry to position the wood flooring needs installed in the school for at least 24 hours in advance to the wooden floor are adapted to the environment before installation.-Prepare enough socket to use for cutting machines, drilling machines with power ~ 220V-210V comply with industrial safety provisions.
đang được dịch, vui lòng đợi..