Hey. Conditions ended borehole
- borehole depth end was expected and stated in the survey request form. Based on the size of the project and regional geology exploration depth recommendations as follows:
+ For cohesive soil (clay soil type): There are 7.5 meters deep drill continuously with NSPT ≥ 20 blows / 30cm; Equivalent soil with semi-rigid state.
+ For loose soil (sandy soil type): There are 7.5 meters deep drill continuously with NSPT ≥ 30 blows / 30cm; Equivalent grades tight state land.
+ For bedrock: minimum 2.5 meter deep drilling continuous weathering of rock and fractured medium;
- During the drilling process, if the borehole has satisfied the conditions to borehole end, but not yet reached borehole depth as expected then allow drilling stops.
- the drill hole reached the depth planned but have yet to satisfy the conditions of ended borehole, then:
+ If geological drill holes survey insignificant change is to allow deep drilling in 03 holes drilled to 01 until the end satisfied borehole conditions.
+ If geological survey drill holes complex changes, the latest 03 drill holes for satisfy conditions until the end borehole.
- when drilling encountered stratigraphic complex changes. Drilling Unit survey immediately notify the Owner and the relevant parties to the settlement.
F. Drilling
The drilling sampling was conducted to determine the stratigraphic boundaries, the status of the ground works. Rotary drilling method applied by instillation solution Bentonite clay. During the drilling process ensures boreholes are vertical, not collapse into wells. After the end of the drilling conducted monitoring the water level in the borehole during 24h, each measuring 1 hour. After monitoring boreholes are filled up in order to ensure safety and environmental hygiene.
The drilling will be documented fully in cylindrical drill holes. Cylindrical borehole should demonstrate the following: