The logical process of Km 14 + 500-Km 8 + 400 in package CW3A-traffic development project the municipality of Haiphong was Pmu area transportation works (Pmu) delivered to the contractor according to the minutes of May 7, 2015. However, in practice only the section of the road and the existing levees are handed, left households online have not been compensated and handed the premises (Nutrition Center of China, credit card companies, the salt company, ...). Currently, the contractor has conducted makeshift fences set up by section from Km 14 + 530-:-Km14 + 627 to serve the construction of BTCT pile test pile in 45x45cm categories Open cellar-basement chui bridge Railings expected on 20/10/2015. After piling contractors will try to cast the stakes, and the preparation of mass pile. To mass pile construction the contractor must perform the following tasks: -Close the old larsen has top CU high by existing levees face (30/10/08-23/11/15); -Dismantling existing Dyke (' 17/11/15-26/11/15); -Mass pile (27/11/15-24/02/16); -Close the old larsen left (the area now also entangled the premises): 24/11/15-19/12/15 -Digging ground to execute the open jaw burning from U4 ' U1 ' and to burn L1, L2 ' wall ' (04/03/16-12/06/17) So, with construction plan as above, the work of handing the left side by the slowest route on 30/10/2015 must be delivered to the contractor. The case using the slow delivery will lead to the arising costs due to save the old larsen pending handover of premises. To create favorable conditions for bidders continue to progress according to the schedule already committed, the glasses suggest You review, support contractor working with the local authorities about the completion of the relevant procedures, to hand over the premises to the contractor as per the above suggestions. We share and understand the difficulties that Ban is to remove, however if the premises were not properly proposed time handed over by contractors meant that we had to stop construction work items open the bridge tunnel Barrier (the Hai An district) to wait to hand over enough by construction of the area and of course duration combination Council will also be extended (beyond the current delay time). In the case are the official direction from the Board on the progress right the pile outside the area still entangled by above, the contractor will close the old larsen and mass pile of items had been part of the gap by tunnel. However, if the remaining ground not timely delivered according to plan, all arise to save other expenses and larsen piles due to waiting for delivery by the contractor will have to be paid. Contractors are looking forward to getting feedback from the Board of the Quarter, as the basis for us to implement the next steps.
đang được dịch, vui lòng đợi..